HMGHMGConstruction ManagementSA, Geneva, Switzerland
FR
+41 22 552 08 22
info@hmgconstruction.ch
Project management by municipality

Construction project management in Choulex

Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.

Planning building work in Choulex? HMG Construction Management SA, an independent firm founded in Geneva in 2014, handles the plans, the permit application as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals), the costing, the choice of contractors and the management of the site to SIA standards, through to handover.

What is the building stock in Choulex?

Choulex is a small municipality of 1,245 residents on 391 hectares, or 319 inhabitants per km² according to its cantonal statistical profile. At the end of 2025, the OCSTAT count of residential buildings lists 311 buildings, 216 of them single-family houses. More than four buildings in ten predate 1946 (142), while only 47 were built after 2000.

The share of old buildings steers projects towards upgrading. Insulating without damaging the walls, renewing a roof covering, replacing a heating system, creating rooms inside an existing volume, these are the requests one would expect from a stock of this age. Before that, a survey for hazardous substances prevents a stoppage on site. The Choulex municipal website is the source for local information.

Procedures in Geneva

An energy renovation is prepared with a CECB+ certificate, which describes the energy condition of the building and the renovation options. Grants from the Programme Bâtiments have to be requested before the works start, so the timetable must be set early. Works that do not alter the general appearance of the building fall under the fast-track procedure, called APA. Our guide to procedures for building work in Geneva puts these steps in order.

Types of work in Choulex

How HMG manages your project in Choulex

There are two ways of working. HMG can take on everything, from the survey of the house to the final account, with the plans and the permit application. The firm can also step in once your architect has obtained the permit, and manage construction alongside them.

For an old house, HMG arranges opening-up works before tendering, so that contractors price a job they can see. Bids are compared line by line. During the works, the firm checks the workmanship, keeps the minutes and flags every cost variation before it is committed.

Municipalities in the same sector

If your property is in another municipality of the same sector as Choulex, these pages give the same kind of overview.

HMG projects in the canton of Geneva

Frequently asked questions

What share of the buildings in Choulex is old?

According to OCSTAT, 142 of the 311 residential buildings date from before 1946, more than four in ten. In those buildings, a survey for asbestos, PCB and lead comes before the works.

When should grants for an energy renovation be requested?

Before the works start. HMG builds the request into the schedule, after the CECB+ certificate and before the contracts with the contractors are signed.

Can an old house be insulated without changing its appearance?

Often, from the inside, through the roof or by replacing the windows. HMG compares the options with their cost and their effect, then leaves the choice to you.

Related guides and pages

Your project

Request a call back

Describe your project in a few lines. HMG calls you back within 24 hours.

+41 22 552 08 22

CallRequest a call back