Construction project management in Florissant-Malagnou, Geneva
Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.
HMG Construction Management SA works with owners, managing agents and co-ownerships in Florissant-Malagnou, where post-war buildings hold the largest share of homes. Whether the job is a flat, an energy upgrade of a block or one of the sector's single-family houses, the firm sets the budget, picks the contractors with you and steers the works through to completion.
What is the building stock like in Florissant-Malagnou?
Here the period from 1946 to 1980 carries the most weight. According to the OCSTAT table of dwellings by construction period, 3,833 of the 8,708 dwellings counted at the end of 2025 are in buildings from those three decades, more than four in ten. The years 1946 to 1960 alone account for 1,909, more than one in five.
Older stock is still well represented, with 2,120 dwellings in buildings from before 1946, close to a quarter. The 1980s were also a busy decade, with 1,104 dwellings, and buildings completed after 2000 hold 1,057, more than one in ten, of which 966 are in buildings finished after 2010.
The table of buildings by type counts 665 buildings at 30 September 2026. The house with several dwellings is the most common type, with 281 buildings, more than four in ten. Next come 168 residential buildings with an ancillary use, 121 non-residential buildings and 69 single-family houses, roughly one building in ten.
For your project, this points to two broad kinds of work. In blocks from 1946 to 1980, envelope insulation, window replacement, the heating plant and the plumbing risers often need tackling together. In single-family houses, projects tend to be full renovations, extensions or an added storey.
Permits and grants
With an energy project, the order of steps matters. Grants from the Programme Bâtiments, the national buildings subsidy scheme, must be applied for before work starts, and a CECB+ certificate describes the building's energy performance and sets out renovation options. The permit itself follows the fast-track procedure (APA) or a full application (DD) depending on the scale of the work, and the LDTR, the Geneva law on renovating housing, applies to flats in residential buildings. Our page on building permits in Geneva brings it all together.
The most requested work in Florissant-Malagnou
- Energy renovation, for the 3,833 dwellings built between 1946 and 1980.
- Facade renovation and insulation, often the first item on a post-war block.
- Apartment renovation, in the 281 houses with several dwellings and in the other blocks.
- Bathroom renovation, to be planned around the building's risers.
- House renovation, for the sector's 69 single-family houses.
- House extension, when a house needs more floor space.
How HMG manages your project in Florissant-Malagnou
The firm can step in at two points. It can design the project, draw up the plans and file the permit application as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals), then manage the works. Or it can come in once your architect has obtained the permit, and run construction together with them.
For a block renovation, HMG first agrees the brief with the owner or the PPE (co-ownership), has a CECB+ prepared where it helps and submits the grant application before anything is ordered. Contractors are then tendered trade by trade, the programme is arranged so that the flats remain habitable, and the firm tracks costs right through to the final account.
Other sectors of the Eaux-Vives district
Florissant-Malagnou shares the Eaux-Vives statistical district with just one other sector, whose buildings are older.
Projects managed by HMG in the City of Geneva
Frequently asked questions
How many dwellings in the sector date from 1946 to 1980?
OCSTAT counts 3,833 out of 8,708 at the end of 2025, more than four in ten. These blocks are usually first in line for a renovation of the envelope and building services.
Should grants be applied for before signing with contractors?
The Programme Bâtiments application has to be made before work begins. The firm builds it into the programme so that no order puts it at risk.
Does the firm also work on single-family houses?
Yes. There are 69 in the sector, and the firm has managed villa renovations as well as projects on residential blocks. The way it prices and supervises the work is the same.