Construction project management in Cité-Centre, Geneva
Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.
HMG Construction Management SA manages apartment renovations, work on old buildings and fit-outs of commercial premises in the Cité-Centre sector, which includes the Old Town. The firm prices the project, tenders it to contractors and supervises the site through to handover. It can also draw up the plans and file the permit application as a registered MPQ agent.
What kind of buildings does Cité-Centre have?
The OCSTAT table of dwellings by construction period lists 4,738 dwellings in the sector at the end of 2025. Of these, 3,838 are in buildings put up before 1946, more than eight in ten, and 3,252 in buildings that predate 1919, over two thirds of the total. Only 32 are in buildings completed after 2000.
The table of buildings by type counts 1,053 buildings at 30 September 2026. 420 of them are non-residential, close to four in ten. The rest are 369 residential buildings with an ancillary use, 145 houses with several dwellings, 105 buildings partly used for housing and just 14 single-family houses.
In practice, most homes in the sector sit in buildings over a hundred years old. Before you open up a partition, lift a floor or redo a roof, plan for a hazardous substances survey, and have the existing structure measured properly so the costing is not guesswork. The high share of non-residential buildings also points to office, shop and practice fit-outs, sometimes in buildings that combine housing and business.
Which permits apply in Geneva?
Building permits are issued by the OAC, the cantonal building permits office. An internal alteration that leaves the building's overall appearance unchanged normally goes through the fast-track procedure (APA), while larger projects need a full application (DD). For flats in a residential building, the LDTR, the Geneva law governing renovation and conversion of housing, also applies, and the canton's page on asbestos, PCB and lead is directly relevant to stock this old. Our guide to building permits and procedures covers each step.
What work can HMG take on here?
- Apartment renovation, mostly in buildings from before 1946.
- Roof renovation, a common job on century-old buildings.
- Facade renovation, starting with a careful survey of the masonry.
- Office fit-out, given the many non-residential buildings.
- Shop fit-out, for a ground-floor unit or a boutique.
- Medical practice fit-out, to set up a practice in existing premises.
How is a site run in such old buildings?
There are two ways to work together. HMG draws up the plans, files the permit application and then manages the works. Or your architect designs the scheme and obtains the permit, and HMG takes the file over for construction, working alongside them.
With an old building, the budget is protected at the outset. The firm has the existing fabric investigated, obtains comparable bids from contractors and keeps a contingency for what demolition reveals. On site it coordinates the trades, agrees access and disruption with the régie (managing agent) or the PPE (co-ownership) so that neighbours and businesses are considered, checks every progress claim and runs the handover to SIA standards.
Other sectors of the Genève-Cité district
Cité-Centre is one of four sectors making up the Genève-Cité statistical district. Each of the others has a different building stock.
Projects managed by HMG in the City of Geneva
Frequently asked questions
How many dwellings in Cité-Centre predate 1946?
OCSTAT counts 3,838 out of 4,738 at the end of 2025, more than eight in ten. In buildings of that age, a hazardous substances survey and a measured survey of the existing structure are the first items to budget for.
Do I need an architect to renovate a flat in the Old Town?
Not necessarily. HMG can draw up the plans and file the application as a registered MPQ agent. If you already have an architect, the firm takes over the file once the permit is granted and works with them.
Does the firm also fit out offices and shops?
Yes. It has managed projects for offices, restaurants and clinics. In a sector where 420 of 1,053 buildings are non-residential, such projects matter as much as flat renovations.
Related guides and pages
Request a call back
Describe your project in a few lines. HMG calls you back within 24 hours.




