Construction project management in Saint-Gervais-Chantepoulet, Geneva
Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.
In Saint-Gervais-Chantepoulet, HMG Construction Management SA runs flat renovations, shop fit-outs and office projects in buildings where homes and businesses share the same address. The firm estimates the cost, selects the contractors with you, sets the programme and manages the site. Where needed, it also prepares the plans and the permit application.
A small sector of mixed-use buildings
Of the four sectors in the Genève-Cité district, Saint-Gervais-Chantepoulet is the smallest, both in dwellings and in buildings. The OCSTAT table of buildings by type counts 365 buildings at 30 September 2026, 113 of them non-residential, just over three in ten. The most common type is the residential building with an ancillary use, with 172, close to half the total. There are no single-family houses at all.
As for age, the table of dwellings by construction period shows 2,878 dwellings at the end of 2025. 1,869 are in buildings from before 1946, nearly two in three. The decades from 1971 to 2000 add 664, more than one in five, while buildings completed after 2000 hold only 21.
For your project, the mix of uses matters as much as age. Renovating a flat above a shop, converting a unit or repairing a facade happens in a building that is busy during office hours and in the evening alike. Noisy work has to be timed carefully, common areas protected and every occupant told in advance, whether tenant, co-owner or shopkeeper.
Permits you should know about
The fast-track procedure (APA) covers internal alterations and work that leaves the building's overall appearance unchanged. Anything that alters that appearance, a facade for instance, normally needs a full application (DD), which with rare exceptions only an agent on the MPQ register of qualified professionals may file. A change of use has to be looked at case by case. For housing, the LDTR, the Geneva law on demolition, conversion and renovation of residential buildings, sets its own rules. The canton describes the types of permit, and our page on building permits in Geneva sums them up.
The most frequent projects
- Apartment renovation, in a building that also hosts other uses.
- Bathroom renovation, to be coordinated with the neighbours below.
- Shop fit-out, for a unit at the foot of a residential building.
- Office fit-out, in one of the 113 non-residential buildings or a mixed-use block.
- Building conversion, when a unit changes use.
- Energy renovation, particularly for buildings put up between 1971 and 2000.
How HMG manages your project in Saint-Gervais-Chantepoulet
You can hand HMG the whole project, from the plans to handover, with the firm filing the application as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals). Or you keep your architect for the design and the permit, and HMG takes over for construction in agreement with them.
In a mixed-use building, the programme is what makes the difference. HMG draws it up with the régie (managing agent), the PPE (co-ownership) and the shopkeepers concerned, groups the noisy phases together, schedules deliveries and waste removal outside opening hours where it can, and holds a weekly review with the contractors. Invoices are checked before payment and handover follows SIA standards.
Other sectors of the Genève-Cité district
The three other sectors of the statistical district each have their own page.
Projects managed by HMG in the City of Geneva
Frequently asked questions
Which building type is most common in Saint-Gervais-Chantepoulet?
The residential building with an ancillary use. OCSTAT counts 172 of them out of 365 buildings at 30 September 2026, close to half. The sector has no single-family houses.
Can I turn a commercial unit into a flat?
That is a change of use, and the permit procedure that applies needs looking at from the outset. The firm reviews the file with you before any costing and, if a full application is required, files it as a registered MPQ agent.
How do you avoid disrupting the shops in the building?
By involving them in the programme. Noisy work is grouped together, access routes are protected and shopkeepers are told the dates well in advance.
Related guides and pages
Request a call back
Describe your project in a few lines. HMG calls you back within 24 hours.




