Construction project management in Délices-Grottes, Geneva
Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.
In the Délices-Grottes sector, HMG Construction Management SA helps owners, managing agents and co-ownerships renovate flats, bring buildings up to date and improve their energy performance. The firm works out the cost, appoints the contractors, sets the programme and manages the site, with or without your architect.
The sector with the most homes in the district
Délices-Grottes has 7,383 dwellings at the end of 2025, more than any other sector in the Genève-Cité district. The OCSTAT table by construction period shows housing built across many decades. 3,561 dwellings, just under half, are in buildings from before 1946. The years 1946 to 1960 added 1,485, about one in five, and the whole 1946 to 1980 period 2,532, more than a third. The 1991 to 2000 decade still accounts for 774, over one in ten, against 126 after 2000.
The table of buildings by type lists 577 buildings at 30 September 2026, 124 of them non-residential. There are 187 houses with several dwellings, close to a third of the total, alongside 229 residential buildings with an ancillary use, 31 buildings partly used for housing and 6 single-family houses. The sector has fewer buildings than Cité-Centre, 577 against 1,053, yet far more dwellings at the same date, 7,395 against 4,749. Its blocks are therefore considerably larger on average.
The main issue in this stock is post-war housing. Poorly insulated envelopes, building services nearing the end of their life and original kitchens and bathrooms are the usual topics in buildings of that kind. An energy renovation starts with a condition survey, and in large blocks every decision goes through the managing agent or the co-owners' meeting.
Permits and grants
In a residential block, the LDTR, the Geneva law on renovating and converting housing, governs work inside the flats, which covers a large share of projects here. For an energy renovation, the CECB+ certificate describes the building's condition and renovation options, and grants from the Programme Bâtiments subsidy scheme must be applied for before work begins. Our page on building permits and procedures in Geneva goes through the process.
What work is typical in Délices-Grottes?
- Energy renovation, for the blocks built between 1946 and 1980.
- Facade renovation and insulation, often part of the same scheme.
- Apartment renovation, a frequent job in a stock of over 7,000 dwellings.
- Kitchen renovation, once the original fittings have had their day.
- Bathroom renovation, sometimes combined with work on the building's pipework.
How HMG handles whole-building projects
The firm works in one of two ways. It takes on everything, from the plans and the permit application, filed as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals), to managing the works. Or your architect leads the design up to the permit, and HMG then takes over the file and delivers the project with them.
For a whole building, HMG prepares figures the managing agent or the co-owners' meeting can compare and vote on, splits the work into phases residents can live with and keeps track of grant deadlines. On site it directs the contractors to SIA standards, monitors costs item by item and arranges handover with the client.
Other sectors of the Genève-Cité district
The Genève-Cité district has three other sectors, with older or more mixed building stock.
Projects managed by HMG in the City of Geneva
Frequently asked questions
How many dwellings in the sector were built between 1946 and 1980?
OCSTAT counts 2,532 out of 7,383 at the end of 2025, more than a third. For buildings of that period, an energy renovation is often worth studying.
When should Programme Bâtiments grants be applied for?
Before work starts. The firm builds this step into the programme so the application goes in on time.
How do you get works approved by a co-ownership?
With a clear, priced file that owners can compare. HMG prepares the bids and the programme and can present them to the co-owners' meeting before the vote.