HMGHMGConstruction ManagementSA, Geneva, Switzerland
FR
+41 22 552 08 22
info@hmgconstruction.ch
City of Geneva, Petit-Saconnex district

Construction project management in Grand-Pré-Vermont, Geneva

Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.

In Grand-Pré-Vermont, where more than half of all homes were built between 1946 and 1960, HMG Construction Management SA manages flat renovations, repairs to apartment blocks and energy upgrades. The firm sets the budget, selects contractors with you and runs the site, and can also produce the plans and the permit application where needed.

How old are the buildings in Grand-Pré-Vermont?

One period stands out. The OCSTAT table of dwellings by construction period records 6,106 dwellings in the sector at the end of 2025, and 3,154 of them are in buildings put up between 1946 and 1960, more than half. Add the 800 dwellings from 1961 to 1970 and close to two homes in three date from that quarter-century. Buildings from before 1946 hold 1,485 dwellings, nearly a quarter, while those completed after 2000 account for just 335.

The OCSTAT table of buildings by type lists 379 buildings at 30 September 2026, with 6,108 dwellings between them, an average of more than sixteen per building across all types. There are only 12 single-family houses. The rest are 168 houses with several dwellings, 109 residential buildings with an ancillary use, 8 buildings partly used for housing and 82 non-residential buildings, slightly more than one in five.

For anyone planning work, this means most homes sit in apartment blocks more than sixty-five years old. At that age the building envelope, the services and the kitchens and bathrooms often all come due at once. A hazardous substances survey should come before any internal strip-out, and a CECB+ energy certificate helps compare renovation options before anything is priced.

Which permits apply here?

With just 12 single-family houses, almost every home in the sector is in a block of flats, so the LDTR, the Geneva law on the renovation and conversion of housing, affects a large share of flat renovations. The procedure then depends on the scope. Internal alterations go through the fast-track procedure (APA), anything outside it needs a full application (DD), and both are filed online through the AC-Démat platform. For an energy upgrade, the Programme Bâtiments grant must be applied for before work starts. Our guide to building permits and procedures in Geneva covers each point.

What work does a post-war building stock call for?

How does HMG run a project in a post-war block?

You can hand the whole job to HMG, from the measured survey and plans through to handover, with the permit application filed by the firm as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals). If an architect has already taken the scheme as far as the permit, HMG takes over for construction and works with them until completion.

In a block of flats, the water and waste risers serve several homes, so a bathroom cannot be redone in isolation. The firm obtains bids that can be compared item by item, agrees the programme with the régie (managing agent) or the PPE (co-ownership), warns neighbours ahead of noisy phases and checks every progress claim before it is paid. The works are managed to SIA standards through to handover and the final account.

Other sectors of the Petit-Saconnex district

Grand-Pré-Vermont is one of six sectors in the Petit-Saconnex statistical district of the City of Geneva. Their pages describe building stock with a different profile.

Projects managed by HMG in the City of Geneva

Frequently asked questions

What share of homes in the sector date from 1946 to 1960?

More than half. OCSTAT counts 3,154 dwellings from that period out of 6,106 at the end of 2025. No other period comes close, the next largest being pre-1919 with 903 dwellings.

Can I renovate a flat in Grand-Pré-Vermont without touching the common parts?

Yes, many renovations stay entirely within the flat. The works still have to be organised with the régie or the PPE, and the LDTR may apply. The firm settles these questions before inviting bids.

How do I prepare an energy upgrade for a building in the sector?

Start with a CECB+, which describes the building's energy performance and sets out renovation options. The Programme Bâtiments grant has to be requested before work begins. HMG then prices the chosen option and organises the works.

Related guides and pages

Your project

Request a call back

Describe your project in a few lines. HMG calls you back within 24 hours.

+41 22 552 08 22

CallRequest a call back