Construction project management in Saint-Jean-Aïre, Geneva
Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.
In Saint-Jean-Aïre, HMG Construction Management SA manages the renovation of older blocks, flats and single-family houses. The firm starts with a survey and an assessment of the building, works out the cost, selects contractors with you and then runs the site to SIA standards. It can also draw up the plans and file the permit application.
How old are the homes in Saint-Jean-Aïre?
Older buildings carry real weight here. According to the OCSTAT table of dwellings by construction period, at the end of 2025, 1,673 of the sector's 5,165 dwellings were in buildings put up before 1946, close to a third, and 765 in buildings from before 1919. The post-war years follow with 1,154 dwellings from 1946 to 1960 and 619 from 1961 to 1970. More recently, 749 dwellings date from 1991 to 2000 and 782 from after 2000, of which 506 are from after 2010.
The OCSTAT table of buildings by type lists 518 buildings at 30 September 2026. 141 of them are single-family houses, more than one in four. The others break down into 174 houses with several dwellings, 90 residential buildings with an ancillary use, 15 buildings partly used for housing and 98 non-residential buildings.
Two kinds of project follow from this. In older blocks, roofs, facades and flats are renovated once asbestos, PCBs and lead have been checked for. In single-family houses, the likely projects are a full renovation, an energy upgrade or an extra storey, each with its own structural constraints.
Which procedures apply to an older house or block?
Before you touch an older building, the canton's page on asbestos, PCBs and lead explains what needs checking. The procedure then depends on the project. Internal alterations, or work that leaves the building's overall appearance unchanged, go through the fast-track procedure (APA). Larger schemes need a full application (DD), which, with rare exceptions, only an agent on the MPQ register of qualified professionals can file. For flats in residential buildings, the LDTR, the Geneva law on the renovation of housing, also applies. Our guide to building permits and procedures covers each case.
What work could you plan in Saint-Jean-Aïre?
- House renovation, for the sector's 141 single-family houses.
- Roof renovation, a common starting point on a building from before 1946.
- Apartment renovation, in older blocks and post-war ones alike.
- Adding a storey, to gain floor space on an existing house.
- Energy renovation, to cut the consumption of an older house.
- Facade renovation, based on an accurate survey of the old masonry.
How does HMG run a project in Saint-Jean-Aïre?
If you are starting from scratch, HMG surveys the building, designs the scheme, files the application as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals) and then manages construction. If your architect already holds the permit, the firm takes the file over at that point and delivers the project with them, without redoing what has been done.
With an older building, surprises come with the job. The firm has uncertain areas opened up before asking for bids, builds a contingency into the budget and records every change along with its cost. If you are living in the house during the works, it splits the job into phases so that part of the home stays usable.
Other sectors of the Petit-Saconnex district
Saint-Jean-Aïre is one of the six sectors in the Petit-Saconnex statistical district. The pages for the other five sectors and for the city are linked below.
Projects managed by HMG in the City of Geneva
Frequently asked questions
How many single-family houses are there in Saint-Jean-Aïre?
141 out of 518 buildings at 30 September 2026, according to OCSTAT, more than one in four. Houses with several dwellings outnumber them, however, at 174 buildings.
Is a survey needed before renovating an older flat?
The canton's page on renovating, converting or demolishing safely covers asbestos, PCBs and lead before works. In a sector where close to a third of homes predate 1946, the firm builds this survey into the programme as soon as partitions, floors or plaster are affected.
Can an extra storey be added to a single-family house?
That depends on the plot and the building. A preliminary application (DP) tells you the authorities' position on height and volume before the full drawings are commissioned. HMG has managed six storey additions to apartment buildings in Geneva and Meyrin and can run this kind of project.