HMGHMGConstruction ManagementSA, Geneva, Switzerland
FR
+41 22 552 08 22
info@hmgconstruction.ch
Who HMG works for

Condominiums (PPE) in Geneva, works prepared for the owners' meeting

Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.

HMG Construction Management SA manages works for condominiums in Geneva, known locally as PPE. The firm prepares comparable bids for the owners' meeting, files the permit application as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals) and runs the site while residents stay in place.

What does a PPE need before voting on works?

In a PPE (propriété par étages, the Swiss form of condominium ownership), major works are decided at the general meeting of owners, on a proposal from the administrator. Every owner wants to understand what they are voting for, why these works rather than others, what they will cost and how the cost will be shared. A decision based on mismatched or incomplete quotes often ends up back on the agenda of the next meeting.

Once the works are approved, the building needs one contact who reports to the administrator and to the owners' committee. The owners live in their flats or let them, and the site has to run without cutting off water, heating or access any more than necessary.

What HMG does for a condominium

  • A survey of the common parts, including facades, roof, building services and stairwells.
  • A programme of works ranked by priority, with an estimate for each item.
  • Tenders on a common specification, then a comparison table every owner can read.
  • Presenting the project to the general meeting alongside the administrator.
  • The permit application, the schedule and site management to SIA standards.
  • Acceptance of the works, snagging and a final account handed to the administrator.

For an energy upgrade of the building envelope, a CECB+ certificate sets out the building's current state and the options. Grants from the Programme Bâtiments must be applied for before work starts, and that has to be built into the timetable put to the meeting.

Which rules apply in a residential building?

If the building has flats in it, the works also come under the LDTR, the cantonal law on demolition, conversion and renovation of residential buildings. Depending on the works, the Office des autorisations de construire, the cantonal permit office, decides under the fast-track APA procedure or on a full application, known as DD.

In an older building, asbestos, PCB and lead need to be considered before any work begins, a subject the Canton covers on its page Rénover, transformer ou démolir sans danger (in French). HMG schedules these checks before tendering, because they affect the prices.

With or without an architect, where does HMG come in?

  • The condominium hands everything to HMG. A single mandate then covers the whole operation, from the plans and the permit application to choosing the contractors and running the site.
  • The condominium has already appointed an architect, for instance for a storey addition. The architect keeps the design and the permit, and HMG takes the project through construction, working alongside them until acceptance.

Either way, the administrator has one contact for the site, and the condominium buys site management from a firm that does nothing else, which generally works out cheaper. HMG has managed six storey additions on apartment buildings in Geneva and Meyrin, and our page on building permit applications explains how such projects are approved.

Buildings where HMG managed the works

Frequently asked questions

How should works be presented to the owners' meeting?

With a clear programme, bids prepared on the same basis and a table comparing prices item by item. HMG prepares these documents and can present them together with the administrator.

Can the owners stay in the building during the works?

In most cases, yes. The schedule is planned to limit shutdowns and disturbance, and residents are told in advance about the stages that affect them.

Who oversees the site on behalf of the PPE?

HMG represents the condominium on site. The firm chairs the site meetings, writes the minutes, checks the invoices and reports to the administrator.

Can a PPE add a storey to its building?

It depends on the zone, the permitted building envelope and the structure. Before paying for full studies, the condominium can obtain the authorities' position on siting, height and volume through a preliminary application, known as DP (demande préalable).

Related guides and pages

Your project

Request a call back

Describe your project in a few lines. HMG calls you back within 24 hours.

+41 22 552 08 22

CallRequest a call back