Finding and selecting contractors for your works in Geneva

Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.

HMG Construction Management SA finds the contractors for your works in Geneva, puts them in competition and appoints them. The firm writes the specifications, asks several contractors per trade to price the same scope, compares the bids item by item and prepares clear contracts. You decide knowing every price.

How do you get your building works done without the worry? By handing the management and the coordination of the contractors to HMG. HMG is there for you.

Why go through a tender?

Two quotes written on different bases cannot be compared. One includes floor protection and the other leaves it out, and the cheapest on paper turns into the most expensive on site. A tender fixes this, because every contractor prices the same specification, with the same quantities and the same requirements.

HMG is an independent firm with no financial tie to any contractor. It has no reason to favour one, and its recommendation rests only on price, track record and the contractor's ability to keep to the schedule.

What HMG's assignment covers

  • Splitting the project into work packages by CFC code, the Swiss building cost classification.
  • Writing the specifications and quantities for each package.
  • Choosing which contractors to invite, several per trade.
  • Answering contractors' questions during the tender and sharing the answers with all of them.
  • A bid comparison table, item by item, with the differences explained.
  • Negotiation and an award recommendation for you to approve.
  • Drafting the contracts between you and each contractor, in line with the SIA standards of the Swiss Society of Engineers and Architects.

You see every bid received and you keep the final say on each award.

The steps of a contractor tender

  1. Work packages and list of contractors to invite.
  2. Tender documents sent out, with drawings and specifications.
  3. Contractors' questions, with clarifications sent to all at the same time.
  4. Bids received and checked for completeness.
  5. Comparison, negotiation and award recommendation.
  6. Contracts signed and contractors slotted into the construction schedule.

Packages are tendered in the order the site needs them. Early trades such as demolition or the structural work are awarded first, so that work can start while the finishing packages are still out to tender.

Fees and costs

A firm that specialises in site management usually costs less, because it is all the firm does and it knows current market prices. Competition on a shared specification also brings the final price down. The cost calculation for the works, which is the yardstick for judging the bids, is explained on our page on construction cost consulting in Geneva (in French).

HMG's fees do not depend on which contractor you choose, since the firm has no financial tie to any of them. You deal with one contact, from the tender through to handover.

Who should you approach first?

Contractor selection can happen in two set-ups.

  • HMG runs the whole project. The tenders are then based on its own drawings and on the permit file it submitted.
  • The project was designed by an architect, who obtained the permit. HMG picks up the architect's drawings, prepares the tender and runs it in collaboration with them, before managing the construction.

Either way, the next stage is construction project management (in French), with the contractors you have chosen.

Projects where HMG coordinated the contractors

Frequently asked questions

How many contractors should be invited per trade?

Enough for a real comparison, without spreading serious contractors across an oversized tender. HMG proposes a list suited to each package and to the size of the job, and you can add to it.

Can I suggest a contractor I know?

Yes. They receive the same documents as the others and their bid is compared on the same basis. You then make an informed decision.

Should I always take the cheapest bid?

No. The comparison brings out the omissions, alternatives and reservations in each bid. A lower bid that leaves part of the job out often ends up costing more.

Who does the contractor sign the contract with?

With you, the building owner. HMG drafts the contract, then manages the contractor on site and checks their invoices before payment.

What if a contractor does not keep to its commitments?

HMG records it at the site meeting and in the minutes. The firm insists on the remedies set out in the contract and, if nothing changes, proposes the steps the contract allows, up to replacing the contractor.