Building permit applications in Geneva, APA and DD
Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.
HMG Construction Management SA prepares and files your building permit application in Geneva, under the fast-track procedure (APA) or as a full application (DD). The firm is on the Geneva MPQ list through Haïtam Mennana, registration number MPQF/735. It draws up the plans, assembles the file and follows it through to the decision.
How do you get your permit and your works done without the worry? By handing the management and the coordination of the contractors to HMG. HMG is there for you.
Which procedure applies to your works in Geneva?
Building permits in Geneva are granted by the Office des autorisations de construire (OAC), the cantonal permit office. The official page on permit types (in French) describes two routes. The fast-track APA procedure applies to a new building in the fifth zone with no exemption, a villa for example. It also applies to interior alterations to an existing building, to works that leave its general appearance unchanged, and to minor or temporary new structures. Anything else needs a full application, DD (demande définitive), under the ordinary procedure.
If the siting, use, height limits, volume or access of a project are in question, a preliminary application, DP (demande préalable), gives you the authorities' view on those points before you commit further. Demolishing a building completely requires a separate application, distinct from the one for the new construction.
Who can file the application?
Under the ordinary procedure, the application must, with only a few exceptions, be submitted by a professional on the list of mandataires professionnellement qualifiés (MPQ). For an APA, private owners can file on their own, though the Canton recommends using a registered agent. The rule is explained on the page Je prépare ma demande d'autorisation de construire (in French).
At HMG, the person on the Canton of Geneva's MPQ list is Haïtam Mennana, registration number MPQF/735. HMG draws up the plans and files the application as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals), then answers any requests for further information from the authorities.
What HMG's assignment covers
- Reviewing your works and choosing the right procedure, APA, DD or DP.
- A geo-analysis of the constraints on the plot, which the Canton recommends before filing.
- Checking the rules that apply, including the LCI building law and, for flats in a residential building, the LDTR housing renovation law.
- Taking account of asbestos, PCB and lead before the works, the subject of the official page Rénover, transformer ou démolir sans danger (in French).
- Drawings and supporting documents, prepared on the AC-Démat platform.
- Filing, following the review and answering requests for further documents.
- Putting Programme Bâtiments grants into the timetable, since they must be requested before the works start.
Each procedure is covered in more detail in our guide to building permits and procedures in Geneva.
How does the filing work, step by step?
- Visit, description of the works and choice of procedure.
- Geo-analysis of the plot and check of the applicable rules.
- Drawings, forms and supporting documents.
- Online filing from the free personal account on the AC-Démat platform.
- Following the review and answering the authorities' questions.
- Decision, then preparation of the tenders and the site.
How long the review takes depends on the procedure and on the complexity of the file. HMG builds this into the overall schedule, so the contractors are ready when the permit comes through.
Fees and costs
Getting the file complete first time avoids the back and forth that holds up the whole project. Handing the application and then the site management to a specialist firm usually costs less, because it is the only thing that firm does. The cost estimate for the works, useful from the filing stage, is covered on our page on construction cost consulting (in French).
The level of fees depends on the scope of the file. If HMG then manages the works, you keep the same contact from filing to handover.
Who should you approach first?
You can choose between two set-ups.
- HMG handles everything, from the plans and the permit application to the acceptance of the works, under one agreement.
- Your architect designs the project and files the application. HMG takes over once the permit is granted and manages the construction phase with them.
Either way, the permit and the site stay linked, so a condition attached to the decision is not forgotten on site.
Storey additions managed by HMG
Frequently asked questions
Can a private owner file the application alone?
Yes for an APA, although the Canton recommends using a registered agent. Under the ordinary procedure, only a professional on the MPQ list can file, save for a few exceptions, as the official page (in French) explains.
What is the difference between APA and DD?
APA is the fast-track procedure, intended among other cases for a villa in the fifth zone with no exemption and for interior changes. DD is the ordinary procedure for everything else. The official permit types page (in French) gives the exact list.
What is a preliminary application for?
A DP gives you the authorities' view before detailed design begins, on points such as the siting, use, height limits, volume or access of a project. It is worth filing when one of them is uncertain.
Do I need a separate permit to demolish?
Yes. Complete demolition requires its own application, in addition to the one for the new building. HMG prepares both files and coordinates how they are filed.
Are grants applied for together with the permit?
They follow their own procedure, but Programme Bâtiments grants must be requested before the works start. HMG puts them in the schedule alongside the filing.