Construction scheduling and planning in Geneva

Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.

HMG Construction Management SA draws up every schedule for your works in Geneva, from design to handover. The firm sets the order of the trades, coordinates the contractors at site meetings and updates the schedule at each stage. At any point you know where the works stand and what comes next.

How do you get your building project done without the worry? By handing the management and the coordination of the contractors to HMG. HMG is there for you.

Why does a well-kept schedule make the difference?

On a building site, many delays come not from a slow contractor but from a badly prepared sequence. The tiler arrives before the waterproofing has been checked, the joiner waits for measurements nobody took, an order goes out too late. Every wait knocks on to the trades that follow.

A realistic schedule plans for these links in advance. It also covers what happens before the site opens, such as the permit, the asbestos, PCB and lead check, or Programme Bâtiments grants, which have to be requested before the works start.

What HMG's assignment covers

  • The overall project schedule, from design to acceptance.
  • The schedule for the procedures, including the building permit application and any other files to submit.
  • The tender schedule, in step with the order of the works.
  • The detailed construction schedule, by trade and by zone.
  • Lead times for made-to-measure items.
  • Regular updates to the schedule, shared with every contractor.
  • The schedule for acceptance and for putting right any defects.

You receive every version of the schedule, with the variances explained and the measures taken to recover them.

How does HMG build and keep the schedule?

  1. List of tasks, trades and site constraints.
  2. Order of the works and the links between them.
  3. Overall schedule agreed with you.
  4. Contractors committed to their dates when the contracts are signed.
  5. Progress checked at site meetings and the schedule updated.
  6. Acceptance, snagging and handover of the keys.

When the building stays occupied, for instance a block of flats with tenants or a hotel that keeps trading, the schedule is organised by zones and phases to limit disruption for the occupants.

Fees and costs

A site that keeps to its dates costs less, because every lost week has a price. Handing the schedule and the site management to a specialist firm usually costs less, since that is all the firm does. How the works budget is calculated is covered on our page on construction cost consulting (in French).

The level of fees depends on the scope of the assignment. You have a single contact who is accountable for schedule, budget and quality together.

Who should you approach first?

Scheduling can be handed to HMG in two ways.

  • From the start of the project. HMG draws up the plans, files the permit and builds a schedule that covers everything, from the first design work to handover.
  • After the permit, once your architect has designed the project. HMG takes over the file in collaboration with them and draws up the tender and construction schedules.

The earlier HMG is involved, the more the schedule can allow for the time needed for procedures and orders.

Sites scheduled and managed by HMG

Frequently asked questions

How long do building works take in Geneva?

It depends on the permit procedure, the scale of the works and whether the building is occupied. HMG draws up a dated schedule as soon as the project is defined, then adjusts it at each stage. Our guide to building permits in Geneva describes the procedures.

What happens when a contractor falls behind?

HMG picks it up at the site meeting, works out the knock-on effect on the other trades and proposes a fix, such as extra labour or a change in the order of tasks. The delay and the measures taken go into the minutes.

Can work be done in an occupied building?

Yes. The schedule is then split into zones and phases, with working hours that suit the occupants. Rules on access, noise and cleanliness are agreed with you before work starts and restated to the contractors at site meetings.

Can I follow the schedule from abroad?

Yes. You receive every schedule update, the minutes of the site meetings and a progress report. Decisions you need to take are flagged in advance.