Who HMG works for

Investors and developers in Geneva, projects kept on cost and on time

Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.

HMG Construction Management SA manages projects for investors and developers in Geneva, whether they are building, adding storeys or converting a building. The firm studies feasibility, files the permit application as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals), works out the cost and runs the site.

What does an investor need before committing to a project?

Investors think in terms of return, risk and timing. Before buying a plot or a building, they want to know what can be built there, at what cost and how quickly. During construction they expect reliable figures and early warnings, not surprises in the final account.

Developers have to deliver flats or floor space on a date already given to buyers or tenants. Every delay costs money and every late change eats into the margin. They need someone who keeps the contractors in line and tells them how things really stand.

What HMG does on a property project

  • A feasibility study and, where useful, a preliminary application, called DP (demande préalable), which gives the authorities' view on siting, use, height, volume and access.
  • The plans and the full permit application, called DD (demande définitive), filed as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals).
  • A cost estimate by trade, followed by a reference budget built from the bids.
  • Tenders, negotiation and contracts with the contractors.
  • The master schedule and detailed schedules, kept up to date at every site meeting.
  • Site management to SIA standards, financial tracking and acceptance of the works.

As an independent firm with no financial ties to any contractor, HMG compares bids on a common basis, and the investor can see at every stage how commitments stand against the budget. Our page on contractor selection and tendering explains how the bids are obtained and compared.

Storey addition, new build or conversion?

In Geneva and Meyrin, HMG has managed six storey additions on apartment buildings, including one built in timber. This kind of project creates new homes without new land, but it is built above tenants who stay in place, which calls for careful organisation. Our page on adding a storey in Geneva sets out the stages.

For a change of use, from offices to housing for instance, our page on building conversion in Geneva describes the procedures. Whatever the project, the LDTR, the Geneva law on demolition, conversion and renovation of housing, applies as soon as existing homes are affected.

With your architect, or with HMG alone?

  • The whole project goes to HMG, with one mandate covering the plans, the permit, the costs, the contractors, the schedule and the site.
  • Your architect takes the design through to the permit, and HMG then runs the construction phase with them. Each bills for the part of the work they do best.

Either way, site management goes to a firm that does nothing else, which generally keeps its cost down.

Property projects managed by HMG

Frequently asked questions

Can I find out what a plot allows before I buy it?

Largely, yes. A preliminary application, known as DP (demande préalable), gives the authorities' view on siting, use, height, volume and access. HMG puts the file together and helps you interpret the answer.

How do you avoid going over budget?

By setting a budget based on real bids, keeping changes during construction to a minimum and tracking commitments throughout the works. HMG flags any variance as soon as it appears, with options to bring it back in line.

Do you work outside the Canton of Geneva?

Yes. HMG also works in the cantons of Vaud and Valais and elsewhere in French-speaking Switzerland, for example on hotel and building renovations.

Who represents the investor on site?

HMG, as site manager. The firm runs the site meetings, checks the quality against SIA standards, verifies the invoices and sends you regular reports.