Villa owners in Geneva, from design to the end of the works
Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.
HMG Construction Management SA works with villa owners in Geneva who plan to renovate, extend, add a storey or build. From the first survey to handover, HMG handles the plans, the permit application as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals), the costs, the contractors and the site.
How do you get your villa renovation done without the worry? By handing the management and the coordination of the contractors to HMG. HMG is there for you.
What do villa owners need when they start a project?
A villa is usually a family home, and its owners often live in it during the works or move back in straight afterwards. They want to know what the project will cost before they sign, who is accountable for the site day to day, and a realistic date for getting a finished house back. What they do not want is to end up coordinating a long list of trades themselves on top of their own jobs.
No two projects are alike. Some owners are renovating an older house, others are adding a storey, converting the attic, enlarging the living area or insulating the facades. Others are building a new villa in the fifth zone, the residential villa zone whose rules are set by the LCI, Geneva's main building law. The procedures differ from one case to the next, but the expectation is always the same, a site kept under control from the first day to the last.
What HMG does for your villa
- The plans and a clear description of the works, room by room and trade by trade.
- The permit file, which HMG submits as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals). A villa built in the fifth zone without any exemption goes through the fast-track APA procedure, as the Canton's page on permit types explains.
- A cost estimate before tendering, followed by a budget based on the bids actually received.
- Finding, comparing and appointing the contractors, with precise contracts.
- The schedule for the whole project, updated at every stage.
- Site management to SIA standards (the Swiss engineers and architects association), invoice checks and formal acceptance of the works.
Before any work on an older house, HMG arranges a survey for asbestos, PCB and lead, the three hazards covered by the Canton's page Rénover, transformer ou démolir sans danger (in French). For an energy upgrade, a CECB+ certificate guides the choices, and grants from the Programme Bâtiments must be applied for before the works begin.
Who should you call first about your villa?
You pick the arrangement that fits where you are.
- You have not spoken to anyone yet. HMG takes the project on from the first sketches to handover and remains your single point of contact throughout.
- An architect has already designed your villa or your alterations. They stay in charge of the design and the permit file, and HMG picks up the construction phase in close contact with them. Each is paid for the part of the job they know best.
Because site management is all a specialist firm does, it can usually do it for less. How HMG runs the tenders and compares the bids is explained on our page on contractor selection and tendering in Geneva.
How does the project unfold, step by step?
- A visit to the villa, a discussion of your needs and an initial survey.
- Plans, a description of the works and a cost estimate by trade.
- Submission of the permit file, together with any grant applications.
- Tenders, a line-by-line comparison of the bids and signed contracts.
- Construction, with site meetings, written minutes and cost tracking.
- Formal acceptance of the villa, snagging and the final account.
If you live in the villa while the works go on, HMG can organise the site in zones so that some rooms stay usable. You receive regular reports and make decisions on precise documents, without having to spend your days on site.
Villas renovated under HMG's management
Frequently asked questions
Do I need a permit to renovate or extend a villa in Geneva?
That depends on the project. Interior alterations, works that leave the look of the house unchanged and new builds in the fifth zone without exemptions go through the fast-track APA procedure. Anything outside that needs a full application, known as DD (demande définitive). Our guide to building permits and procedures in Geneva covers each case.
Who files the permit application for my villa?
With rare exceptions, applications under the ordinary procedure must be filed by a professional on the MPQ list, as the Canton explains on its page Je prépare ma demande d'autorisation de construire (in French). At HMG this is Haïtam Mennana, registered under the number MPQF/735.
How much does site management for a villa cost?
The fee depends on the scale of the works and on the scope of the assignment. HMG sends you a written proposal that sets out from the start exactly what the mandate covers.
Can HMG also manage the construction of a new villa?
Yes. The firm has managed five villa projects, and new builds in the fifth zone are part of its work. Our page on villa construction in Geneva explains how it works.
Related guides and pages
Request a call back
Describe your project in a few lines. HMG calls you back within 24 hours.




