HMGHMGConstruction ManagementSA, Geneva, Switzerland
FR
+41 22 552 08 22
info@hmgconstruction.ch
Project management, municipality of Vernier

Construction project management in Aïre

Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.

In Aïre, a locality within the municipality of Vernier, HMG Construction Management SA handles house renovations and extensions as well as work in apartment blocks. Registered on the Geneva MPQ list, the firm draws up plans, files the permit application, sets the budget and directs the contractors.

Your building work in Aïre

Aïre lies within Vernier. The statistical sub-sectors that bear the name Aïre had 2,767 residents at the end of 2025, namely Aïre - Renard (1,517) and Aïre - Pont-Butin (1,250). The source is OCSTAT table T 01.01.14.01.

The remaining figures relate to the municipality. Vernier has 38,823 residents on 769 hectares according to its OCSTAT profile. The OCSTAT table of buildings lists 2,480 residential buildings there, of which 1,544 are single-family houses. Those houses therefore make up more than six residential buildings in ten across the municipality.

For a homeowner, that translates into practical requests. Replacing a roof, insulating a facade, adding a room, rethinking the heating. Each job affects the building envelope and is best decided alongside the others, so the site does not have to be reopened two years later.

Permits in Geneva

An extension or a change to a facade may fall outside the fast-track procedure. In that case the full application (DD) is filed, with rare exceptions, by a professional on the MPQ register, as the cantonal page on preparing an application points out. All the procedures are summarised in our guide to building permits and procedures in Geneva.

Types of work in Aïre

How HMG runs your project in Aïre

The firm works in one of two ways. In the first, it carries the project from end to end and files the permit application as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals). In the second, your architect has obtained the permit and HMG takes over the file for construction, in collaboration with them.

Project control rests on a budget set before contractors are chosen, bids compared line by line and a schedule kept up to date. On site, HMG manages the work to SIA standards, checks quality and approves invoices before they are paid.

Around Aïre

Other pages cover Vernier, its other localities and municipalities in the same area of the right bank.

HMG projects in the canton of Geneva

Frequently asked questions

How many single-family houses are there in Vernier?

The OCSTAT table of buildings lists 1,544 at 31 December 2025, out of 2,480 residential buildings. That figure covers the whole municipality, not Aïre alone.

Roof and facade, should everything be done at once?

Not necessarily, but they should be planned together. The firm draws up an overall programme and helps you decide what to do now and what can wait.

Who files the permit application?

The firm does, as an agent on the MPQ register, when it leads the project. If your architect has already filed it, HMG takes over once the permit is granted.

Related guides and pages

Your project

Request a call back

Describe your project in a few lines. HMG calls you back within 24 hours.

+41 22 552 08 22

CallRequest a call back