HMGHMGConstruction ManagementSA, Geneva, Switzerland
FR
+41 22 552 08 22
info@hmgconstruction.ch
Guides and articles

Guides and articles on building work in Geneva

Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.

This page brings together the guides and articles written by HMG Construction Management SA for owners, property managers and architects preparing building work in Geneva. The guides answer one specific question, while the articles go deeper into a subject. All of them point to the State of Geneva's official sources whenever a procedure is involved.

By Haïtam Mennana, HMG Construction Management SA, registered MPQ agent

What will you find in these guides?

Each text starts from a real question, the kind a client asks at the first meeting or types into a search engine. The short answer comes at the top of the page, the detail follows, and a set of frequently asked questions closes each guide.

If you want a quick answer, start with our page of frequently asked questions about building work in Geneva, which links to the full guide for each of the fifteen questions.

Practical guides

Who coordinates the contractors after the permit?

What happens between the permit decision and the first day on site, and who takes charge of it.

Architect, general contractor or project manager

Three ways of organising a project, with their strengths and limits set out even-handedly.

Avoiding budget and schedule overruns

The habits that keep a project on budget and on time, from the first estimate to the final account.

Following your building site remotely

How to stay informed and take decisions in time when you cannot be on site.

Who checks SIA standards on site?

Who does what in checking the work, from the first site meeting to acceptance.

The SIA phases of a building project

The six phases of the SIA 112 standard and when each party comes in.

Energy renovation grants

The Programme Bâtiments, the CECB+ and the rule not to forget, apply before you start.

Acceptance of works and SIA 118 warranties

How acceptance works, what goes into the record and what follows.

How long do renovation works take?

What makes a renovation take longer or shorter, from the permit to handover.

Geneva construction glossary

APA, DD, CFC, LDTR, MPQ and the other Geneva acronyms, each defined in two sentences.

Articles

How much does project management cost?

What the fees depend on and how to compare two offers like for like.

Choosing a project management firm

The questions to ask before signing, on independence, track record and scope.

Project management or owner's representative?

Two related roles, what sets them apart and when each one fits.

Renovating an occupied building

Organising the works with tenants in place, within the LDTR framework.

Renovating a hotel without closing

Method and schedule for working while the hotel keeps welcoming guests.

Cost consultant and CFC estimate

When to have a project costed and what an overall estimate should contain.

Storey additions in Geneva

The permits required and the rules that apply to existing and new flats.

The IDC heat index in Geneva

What the heat consumption index measures and what a high IDC can require of the owner.

Who writes these guides at HMG?

The texts are written by Haïtam Mennana of HMG Construction Management SA, who is on the Canton of Geneva's register of mandataires professionnellement qualifiés (MPQ), the list of qualified building professionals. The firm manages renovations, storey additions and fit-outs in Geneva and across French-speaking Switzerland, and the guides draw on the questions raised on those projects. For advice on your own project, see the page Direction des travaux à Genève (in French) or request a call back.

A selection of projects managed by HMG

Related guides and pages

Your project

Request a call back

Describe your project in a few lines. HMG calls you back within 24 hours.

+41 22 552 08 22

CallRequest a call back