Who checks that SIA standards are met on my building site?

Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.

On a building site, it is the project manager who checks that the work meets the SIA standards set out in the contracts. HMG Construction Management SA carries out this check for the client, with no financial ties to any contractor, from tendering through to acceptance of the works, with written minutes to back it up.

By Haïtam Mennana, HMG Construction Management SA, registered MPQ agent

What are SIA standards?

The SIA, the Swiss society of engineers and architects, publishes standards that serve as the reference for construction in Switzerland. Some set technical rules for how work is carried out, others organise the relationship between the client, the consultants and the contractors. On a building site they apply in particular because the contracts refer to them.

Two standards come up very often. SIA 112 describes the model of services in six phases, from defining the objectives through to operation, as explained in our guide to the SIA project phases. SIA 118 sets the general conditions for carrying out construction works, including acceptance of the works with a joint inspection and written minutes, the subject of our guide on acceptance of works.

Who is responsible for what?

  • Each contractor answers for the quality of its own work and its compliance with its contract.
  • The project manager, appointed by the client, inspects the work, reports defects, asks for corrections and organises acceptance.
  • Specialist engineers, for structure or building services for example, check their own field where the project involves them.
  • The client decides on the basis of what is reported and accepts the works at handover.

Owners rarely have the time or the training to judge waterproofing, insulation or a connection for themselves. That is why they hand this inspection to a project manager.

Geneva rules on top of the standards

SIA standards do not replace cantonal rules. In Geneva, the LCI, the cantonal building and installations law, sets the construction rules, and the LDTR governs works in flats in residential buildings. The permit issued by the Office des autorisations de construire (OAC), the cantonal permit office, often carries conditions that bind the site just as much as the contract does.

Before working on an existing building, asbestos, PCB and lead must also be considered, as covered on the page Rénover, transformer ou démolir sans danger (in French). The permit file, prepared on the AC-Démat platform (in French), remains the record of what was approved.

Who should you approach first?

Quality control starts at the design stage. Two arrangements allow for it.

  • You give HMG the whole project, from the plans and the permit application to acceptance of the works. The quality requirements are then set by the same team that will check them on site.
  • Your architect takes the design through to the permit, then HMG takes over, working with the architect, to inspect the construction.

How HMG checks the work against SIA standards

Inspection begins before the site opens. The tender documents specify the applicable SIA standards and the quality requirements, so that every contractor commits to them on signing. HMG then checks that the bids accepted genuinely meet them.

During construction, the firm follows the work on site, records its findings in the meeting minutes and has defects put right before the next layer covers them. Insulation or waterproofing is checked before it disappears behind a finish, not once the wall is closed. At the end, HMG organises acceptance with you and the contractors, draws up the list of defects and follows them until they are remedied.

Because HMG has no financial ties with any contractor, a defect that is found is a defect that is reported. The firm works this way on all its projects, from storey additions to hotels, clinics and villas.

Steps in quality control

  1. Choice of standards and quality requirements, written into the tender documents.
  2. Review of the bids and of the contracts with the contractors.
  3. On-site inspections, especially before any element is covered up.
  4. Meeting minutes recording findings and the corrections requested.
  5. Joint inspection of the works and acceptance minutes, under SIA 118 where the contract incorporates it.
  6. Follow-up of defect remedies and final account.

Projects managed by HMG

Frequently asked questions on SIA standards inspection in Geneva

Are SIA standards compulsory?

They apply mainly where the contract refers to them, which is common practice in Switzerland. It is therefore worth checking which standards each contract cites. HMG writes them into the tender documents so that they form part of every contractor's commitments.

Who puts right a defect found during the works?

In principle, the contractor that did the work remedies the defects attributable to it. The details depend on its contract, and on SIA 118 where the contract incorporates it. Our guide on acceptance of works explains what follows.

What happens when the works are accepted?

Under SIA 118, where the contract incorporates it, the client and the contractor inspect the works together and the outcome is recorded in written minutes. Any defects found are listed there. HMG prepares and leads this stage for you.

Can my architect inspect the works?

Yes, if they have also been given the construction phase. Otherwise HMG can carry out this inspection working with the architect, who remains the author of the project and the partner to consult on design questions.