Which grants are available for an energy renovation in Geneva?
Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.
To insulate a building or replace its heating in Geneva, the official source is the Programme Bâtiments, the national buildings programme, whose grants must be applied for before the works start. Amounts and conditions are published by the programme and change over time. HMG Construction Management SA checks those in force for your project and builds the application into the schedule.
What support is there for renovating a building?
The Programme Bâtiments (in French) supports works that cut a building's energy use, such as insulating the building envelope or replacing a heating system. The programme publishes the eligible measures, the conditions and the amounts itself. These change, which is why this guide gives no figures. What counts is what the programme publishes on the day you apply.
Other support may be available depending on the type of building and the works planned. Before the budget is set, HMG reviews which schemes genuinely apply to your project, using the official sources, and tells you what each one requires.
When does the grant application have to be filed?
Before the works start. This is the most important rule and the one most often missed. Starting on site too early, even for part of the works, can cost you the grant.
The schedule therefore has to be worked out backwards. The grant application comes after the plans and the cost estimate, because the measures have to be described, but before any contractor is told to start. HMG treats it as a stage in its own right in the master schedule, just like the building permit.
Where does an energy renovation begin?
With a survey of the building. The CECB+ certificate describes the building's energy performance and sets out renovation options. It lets you compare scenarios, for example dealing with the roof and windows first or doing everything in one go, and test them against your budget.
For a heated building in Geneva, the heat index, known as IDC, is another indicator. It is calculated every year from the building's energy consumption and monitored by the cantonal energy office (OCEN). A high IDC can lead to obligations for the owner, and the Canton publishes the thresholds and deadlines.
In an older building, the possible presence of asbestos, PCB or lead also has to be checked before work starts, as the Canton explains on its page Rénover, transformer ou démolir sans danger (in French).
Do energy works need a building permit?
It depends on the works. Insulating a facade, replacing windows or altering a roof can change the look of the building, and the procedure is not the same as for interior alterations. The official page Types d'autorisations (in French) explains what falls under the fast-track procedure, known as APA, and what needs a full application, known as DD, filed with the Office des autorisations de construire (OAC), the cantonal permit office.
In a residential building, the LDTR, the Geneva law on alterations to housing, also governs works in the flats. Each situation is set out in our guide to building permits and procedures in Geneva.
How does HMG manage an energy renovation?
- Survey, CECB+ certificate and choice of a works scenario with you.
- Plans, cost estimate by trade and a check of the grants currently available.
- Permit application where one is needed, filed by HMG as a registered MPQ agent.
- Grant application, always before the works start.
- Tendering, comparison of bids and contracts with the contractors.
- Site management to SIA standards, then acceptance of the works and collection of the documents needed for the grant to be paid.
The firm follows the works through to the end, so that what is built matches what was announced in the application. Our page on house energy renovation in Geneva describes this type of project.
Who should you call first?
You can hand the whole project to HMG, from the survey to acceptance, with a single point of contact for the plans, the permit, the grant and the works. Or you can keep your architect for the design and the permit, and HMG takes over the file for construction, working with the architect and making sure the grant timetable is respected.
Building renovations managed by HMG
Frequently asked questions about grants in Geneva
How much can I receive?
The amounts depend on the measures and are set by the Programme Bâtiments (in French), which publishes and updates them. HMG checks the amounts in force for your project before building the budget.
Can I apply once the works have started?
No. The application must be made before the works begin. That is why HMG places it in the schedule ahead of any start instruction to the contractors.
Is a CECB+ certificate useful before applying?
It gives a full picture of the building's energy performance and of the renovation options. That makes it a sound basis for choosing the works and preparing the application. The CECB+ website describes the certificate.
Does an energy renovation need a permit?
Often, as soon as the works affect the envelope or the appearance of the building. The Canton's page Types d'autorisations (in French) shows which procedure applies.
What about tenants?
In a residential building, the LDTR governs works in the flats. Our article on renovating an occupied building in Geneva explains how to organise the works with the tenants in place.
Related guides and pages
Request a call back
Describe your project in a few lines. HMG calls you back within 24 hours.