How much does construction project management cost in Geneva?
Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.
The cost of construction project management in Geneva depends on the scope of the assignment, the size of the site and the number of contractors to coordinate. Using a specialist firm such as HMG Construction Management SA usually costs less, because managing works is all it does. Fees are agreed in writing before the assignment starts.
Why is there no single price?
Two projects of the same floor area can call for very different amounts of management. Repainting an empty flat is nothing like renovating an occupied apartment building, where every intervention has to be agreed with the residents. A rate per square metre or a flat fee would tell you little about what you will actually pay.
The price of project management is built from the assignment itself. What does the firm take on, for how long, how often is it on site and how closely does it track costs? That description is what you need before comparing any figures.
What does the price depend on?
- The scope of the assignment. Does the firm only manage the construction phase, or does it also handle the plans, the permit application and the tendering?
- How complex the building is. A storey addition, a major conversion or an old building needs more studies and checks than an interior fit-out.
- The number of trades. Each extra contractor means more bids to compare, more interfaces to sort out and more invoices to check.
- Occupancy constraints. A hotel that stays open, an occupied apartment building or working offices require the site to be split into small phases and more coordination.
- The level of reporting you expect. How often meetings are held, reports to the owner, cost tables and a detailed final account are all part of the assignment and are priced accordingly.
The cost estimate for the works, broken down by CFC headings (the Swiss construction cost classification), is often the starting point for sizing the assignment. It is covered on our page on construction cost consulting (in French).
Why does a specialist firm usually cost less?
A firm whose only business is project management already has tried and tested methods for tendering, scheduling, site minutes and invoice checks. It does not reinvent its organisation for every project, and the time saved is reflected in its fees.
The biggest saving, however, is on the works themselves. Bids compared line by line, extra work priced before it is carried out, invoices checked before payment and a schedule that holds all prevent costs nobody had planned for. A delay on site, for instance, extends equipment hire, pushes back the date tenants can move in and postpones rental income.
Two ways to hand your project to HMG
The owner chooses the set-up that suits them, and both work well.
- One agreement for the whole project. HMG draws up the plans, files the permit application as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals), calculates the cost, appoints the contractors, prepares the schedules and manages the works to SIA standards (the Swiss Society of Engineers and Architects) through to completion. You deal with one contact from the plans to handover.
- Your architect and HMG. Your architect designs the project and obtains the permit, then HMG takes over the file to run the site, working with them. Each is paid for what they do best.
These two options, and the general contractor route, are compared in our guide Architect, general contractor or project manager.
How do you compare two fee proposals?
Comparing two amounts without comparing the assignments often leads to unpleasant surprises. Before choosing, ask every firm the same questions.
- Who will be on site, and how often?
- Are tendering, bid comparison and drafting the contractors' agreements included?
- Are invoice checks, cost tracking and the final account part of the assignment?
- What happens if the works take longer than planned, or if the brief changes?
- Are the acceptance of the works and the follow-up of defects included?
A proposal that answers these points clearly saves you from extra fees along the way. Our article on choosing a project management firm in Geneva lists the other questions worth asking.
How HMG prepares its proposal
- A first conversation about your project, by phone or through the form, with a call back within 24 hours.
- A visit to the property and a review of the existing documents, such as plans, the permit or quotes.
- Defining the assignment, from the construction phase alone to the full project.
- An initial estimate of the cost of the works, to gauge the size of the project.
- A written fee proposal setting out the services included.
You know what you are paying for, and why, before you sign anything.
A few projects managed by HMG
Frequently asked questions on the cost of project management in Geneva
Can I know the price before committing?
Yes. The fee proposal is given in writing after a visit and once the assignment is defined. You can compare it with other proposals before signing.
Are the fees part of the works budget?
They are part of the total cost of your project, so they belong in your budget. HMG shows them on a separate line, so you can see clearly what goes to the contractors and what goes to project management.
Does keeping my architect cost more?
Not necessarily. Your architect is paid for the design and the permit, HMG for running the site. Each works where they are most effective, and the assignments do not overlap.
Is project management worth it for a small renovation?
As soon as several trades follow one another, someone has to coordinate them. The assignment is then scaled to the size of the job, and so is its price.
Can the price change during the works?
Only if the assignment changes, for instance if you add work or alter the brief. The written proposal sets out in advance how such cases are handled.