HMGHMGConstruction ManagementSA, Geneva, Switzerland
FR
+41 22 552 08 22
info@hmgconstruction.ch
Service

Construction cost consultancy in Geneva

Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.

HMG Construction Management SA estimates the cost of your project in Geneva, prepares the general cost estimate by CFC code, runs the tenders and tracks the budget through to the final account. A project that is properly costed from the start has every chance of finishing within budget.

What does a construction cost consultant do?

The construction cost consultant (économiste de la construction) is the specialist in building costs. The cost consultant assesses the price of a project at each stage, prepares the tender documents, compares the contractors' offers and tracks spending during the works. The aim is to give the owner a reliable view of the investment, early enough to make decisions.

HMG's cost consultancy services in Geneva

Cost estimates

An outline estimate from the preliminary studies, then a detailed estimate at the preliminary design stage, structured according to the CFC code or the eCCC-Bât classification.

General cost estimate

The general cost estimate (devis général) of the project, the basis for the investment decision and the financing plan, with contingencies clearly identified.

Quantities and specifications

Quantity take-offs and specifications by CFC code, written to obtain offers that can be compared.

Tenders and contract awards

Preparing the tender documents, consulting contractors, comparison tables, negotiation and award recommendation. For public contracts, procedures under the AIMP agreement and publication on simap.ch.

Budget tracking and final account

A dashboard of committed and forecast costs, checks of progress claims and change orders, final account by CFC code.

What cost consultancy brings you

  • A realistic budget before you commit, rather than a bad surprise at the end of the works.
  • Contractors' offers that can be compared on the same basis.
  • A reasoned negotiation, based on Geneva market prices.
  • Full traceability of every franc spent.

Cost consultancy and project management, one team at HMG

Because HMG also manages the works, its cost estimates are checked against the reality of the site every day. That is what makes them reliable, and it is a clear advantage when both roles are given to the same firm.

Related projects

Frequently asked questions

How accurate is a cost estimate?

It becomes more accurate as the project progresses. Under the SIA regulations, an estimate at the preliminary design stage usually aims at about ±15 percent, and a general cost estimate at the project stage at about ±10 percent.

What is the CFC?

The CFC (Code des frais de construction), published by CRB, is the standard classification used in Switzerland to structure the costs of a building. It makes it possible to compare offers and track the budget item by item.

Can you be hired just for a tender?

Yes. HMG can be hired for a one-off assignment, such as an estimate, a general cost estimate, a tender or a check of a final account.

Related guides and pages

Your project

Request a call back

Describe your project in a few lines. HMG calls you back within 24 hours.

+41 22 552 08 22

CallRequest a call back