HMGHMGConstruction ManagementSA, Geneva, Switzerland
FR
+41 22 552 08 22
info@hmgconstruction.ch
Project

Storey addition Livron 17-23, Meyrin

Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.

HMG Construction Management SA managed the one-storey addition to the Livron 17-23 housing estate in Meyrin, for a pension fund. The works took place on occupied buildings, with a new composite structure and metal cladding.

The project

The project adds a full storey to an existing housing estate in Meyrin. The addition rests on a composite structure, which combines load-bearing elements of different kinds to limit the loads transferred to the existing buildings. The extension is clad in metal. This facing gives the new volumes a contemporary identity while staying consistent with the facades of the estate. The result reads as a crown on the buildings rather than as a foreign addition. An aerial video of the site is shown on the French version of this page.

HMG's role on this project

On this project, HMG was the construction project manager acting for the building owner. The role covers site preparation and scheduling, coordinating the contractors at site meetings, checking the quality of the work, monitoring costs and change orders, then handing over the building and following up the snagging list. On a storey addition, HMG also coordinates the interfaces between the new structure, the existing roof and the building services.

Site constraints

The buildings stayed occupied for the whole duration of the works. The project management team therefore had to organise the site above the residents, protect the existing floors and coordinate the works to limit disruption. Tying the new structure into the existing one also required close coordination between the engineer and the contractors.

Key facts

  • Municipality. Meyrin.
  • Type of project. Storey addition.
  • Client. Pension fund.
  • HMG's role. Construction project management.

Photos of the project

Facade of the Livron 17-23 estate after the works
Facade of the Livron 17-23 estate after the works
New storey clad in metal
New storey clad in metal
The housing estate seen from its tree-lined grounds
The housing estate seen from its tree-lined grounds
Inside a flat on the estate
Inside a flat on the estate

Related projects

Related guides and pages

Your project

Request a call back

Describe your project in a few lines. HMG calls you back within 24 hours.

+41 22 552 08 22

CallRequest a call back