HMGHMGConstruction ManagementSA, Geneva, Switzerland
FR
+41 22 552 08 22
info@hmgconstruction.ch
Service

Storey additions to buildings in Geneva

Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.

HMG Construction Management SA has managed six storey additions to buildings in Geneva and Meyrin, from feasibility to works in occupied buildings. A storey addition creates new floor space without using any land, but it is also a complex project, because the works take place above an occupied building. HMG's references include Livron 17-23 in Meyrin and buildings on Rue Lamartine, Rue des Eaux-Vives, Rue de la Servette and Rue Antoine-Carteret.

The challenges of a storey addition

  • Structure. Check the load-bearing capacity of the existing building and choose a light construction system (timber, timber-concrete composite or steel).
  • Permits. A storey addition needs a building permit under the full procedure (DD).
  • Works in an occupied building. Protect the existing roof, deal with the weather and limit disruption for the residents.
  • City logistics. Crane, access, use of public land and deliveries.
  • Connections. Extending the service risers, the lift and the fire protection.

How HMG supports a storey addition

Feasibility study and budget

Analysis of the potential and first estimates of cost and return, together with the architect and the civil engineer.

Tender to lightweight construction contractors

Consulting contractors specialised in lightweight construction and prefabrication, comparing offers and lead times.

Project management of the addition

Detailed planning to shorten the time the roof is open, coordination of every trade, cost and quality tracking.

Relations with the residents

Information for the tenants, management of disruption, coordination with the managing agent.

Storey additions managed by HMG

Six storey additions managed by HMG, most of them in occupied buildings. Livron 17-23 in Meyrin (composite structure), Servette 76-78 (steel structure and composite slab), Lamartine 24 and Lamartine 22 bis (one of them in timber), Eaux-Vives 55 (two levels) and Antoine-Carteret 42. Each project is described in the projects below.

Related projects

Frequently asked questions

Can my building have a storey added?

It depends on the building zone, the permitted height, the capacity of the existing structure and the heritage context. A feasibility study with the architect and the engineer gives a quick answer.

Do the tenants have to leave during the works?

No, in the vast majority of cases. The site is organised so that the residents can stay, with protective measures and a suitable schedule.

How long does a storey addition take?

The works usually last from a few months to more than a year, depending on the size of the project and the construction system. Timber prefabrication greatly shortens the most delicate phase, when the roof is open.

Related guides and pages

Your project

Request a call back

Describe your project in a few lines. HMG calls you back within 24 hours.

+41 22 552 08 22

CallRequest a call back