Energy renovation of a building in Geneva, where to start
Planning building work? Apartment, house or building renovation, a new storey or a roof extension, running the project is our job.
HMG Construction Management SA recommends starting from the IDC heat consumption index, having a survey carried out, dealing with the envelope first and applying for subsidies before the works begin. In Geneva, energy requirements for existing buildings are getting stricter and many owners need to plan the renovation of their buildings. Well prepared, an energy renovation reduces running costs, adds value to the property and can be partly subsidised. Here is the approach HMG recommends.
1. Start from the IDC heat consumption index
The IDC (indice de dépense de chaleur) measures a building's energy consumption for heating and hot water per square metre. In Geneva it is calculated every year and is used as the reference to decide whether renovation measures are needed. It is the starting point of any project, because it shows how much effort is needed.
2. Have a survey carried out
An energy audit (for example a CECB Plus) identifies the main losses, through the facades, the roof, the windows and the heating system. It proposes costed options for the works, ranked by effectiveness.
3. Set the order of the works
- The envelope first, with roof and facade insulation and window replacement.
- Then the heat production, with connection to a district heating network, a heat pump or solar thermal panels.
- Finally the additions, ventilation, photovoltaics and controls.
This order avoids oversizing a new heating system in a building that is still poorly insulated.
4. Apply for subsidies before you start
The canton of Geneva (the GEnergie programme) and the Confederation (the Buildings Programme) support insulation, renewable energy and some comprehensive renovations. As a rule, the application has to be filed and accepted before the works start, so it is a step to include in the schedule from the beginning.
5. Check the permits
External insulation, a change to the roof or the installation of solar panels may need a building permit. HMG checks which procedure applies and files the application as an agent registered on the Geneva MPQ list (mandataires professionnellement qualifiés, the cantonal register of qualified building professionals).
6. Organise the works with tenants in place, HMG's role
Most energy renovations take place in occupied buildings. Informing the tenants in advance, safe scaffolding, phasing by facade and coordination with the managing agent are essential for the works to go well.
Related projects
Frequently asked questions
What is the IDC?
The IDC heat consumption index measures a building's annual energy consumption for heating and hot water per square metre. In Geneva, it is the reference for energy renovation obligations.
Can subsidies be combined?
Cantonal and federal grants are often coordinated, but the rules change. The conditions in force must be checked when the application is filed, before the works start.